Description
Fire Rated Prefab One Room Cabin – 6m x 3.6m
High-quality fire rated prefab cabin designed for site offices, accommodation, and industrial use in UAE.
This unit includes one room, pantry, and bathroom, manufactured with fire-rated wall systems and steel structure.
|
TECHNICAL SPECIFICATIONS OF FIRE RATED PREFABRICATED BUILDINGS |
|||
|
1 |
BASE SKID |
1.1 |
Civil Works- Foundation 400x400x400mm (high) will be provided by the client as per the |
|
1.2 |
Base skid: The steel base skid shall be constructed |
||
|
1.3 |
Lifting eyes are provided at intermediate points along the perimeter beams |
||
|
1.4 |
Anti-corrosive: Perimeter |
||
|
2 |
FLOOR & FINISHES |
2,1 |
Floor Frame: C89x38x0.6mm LGS Joists fixed to the base skid as per design |
|
2.2 |
Floor Decking: One Layer of 18mm thick Cement |
||
|
2.3 |
Floor finish in Dry Area: |
||
|
50mm high PVC |
|||
|
Floor finish in Wet Area: 1.5mm thick PVC vinyl sheet |
|||
|
3 |
WALL FRAMING & FINISHES |
3.1 |
Wall Framing: Cold-formed steel Wall Insulation: 50mm thick Glass wool insulation with 12 Kg/m3 |
|
3.2 |
External |
||
|
3.3 |
Internal |
||
|
3.4 |
Internal |
||
|
4 |
ROOF |
4.1 |
Roof Roof overhangs/parapet/Gutter/fascia/Downpipes are not considered in our |
|
4.2 |
Trusses: Trusses are from cold-formed steel sections |
||
|
5 |
CEILING |
5.1 |
Ceiling: 12mm thick gypsum board, finished with Ceiling Joints shall be covered by 6mm thick CFB joint strips. Ceiling clear height shall be approx. 2.35m |
|
6 |
DOORS |
6.1 |
Entrance Door with Accessories: aluminum door frame with or without |
|
6.2 |
Internal Doors / Toilet Doors: Flat |
||
|
6.3 |
Internal Door Accessories: |
||
|
7 |
WINDOWS |
7.1 |
External |
|
7.2 |
Exhaust Window: Fixed window |
||
|
8 |
ELECTRICAL |
8.1 |
Electrical supply is single-phase 230V, 50Hz/60Hz as |
|
8.2 |
Electrical Final Distribution board (Consumer unit) |
||
|
8.3 |
Concealed PVC conduits shall be provided for |
||
|
8.4 |
PVC insulated Copper wires from NCI or |
||
|
8.5 |
Light Fixtures: |
||
|
8.6 |
Switch / |
||
|
8.7 |
Provision for water heater shall be provided only |
||
|
9 |
HVAC |
9.1 |
Split |
|
9.2 |
Exhaust fans are provided as shown in drawing. |
||
|
10 |
PLUMBING |
10.1 |
PPR pipes shall be used for the hot water and |
|
10.2 |
Sanitary wares: |
||
|
10.3 |
Sanitary fittings: Kitchen Sink: |
||
|
11 |
TELE / DATA CONTAINMENTS ONLY |
12.1 |
PVC conduits shall be provided for Tele/Data point Block wiring, Networking, sockets, junction boxes and system installation |
|
|
EXCLUSIONS: TO BE PROVIDED BY CLIENT: |
|||
|
1 |
Site Work: |
Foundation, |
||
|
2 |
Site entry: |
Entry permits (CICPA/CNIA – Security Permits) for our trailers, workers & Equipment’s and Site must be |
||
|
3 |
Lifting: |
Crane + lifting |
||
|
4 |
Furniture: |
Wardrobes, |
||
|
5 |
Accessories: |
Window blinds, |
||
|
6 |
Structural: |
Design |
||
|
7 |
Electrical: |
All external |
||
|
Generator, any |
||||
|
8 |
Plumbing: |
Embedded |
||
|
9 |
Mechanical: |
Fire Fighting |
||
|
Approvals: |
Civil defense, |
|||





