Description
Delivery: within 8 working days from the date of advance payment
This fire rated prefab portacabin is designed for construction sites, industrial
projects, and staff accommodation across the UAE. The unit is manufactured using
Cold Formed Steel Framing (CFSF) system, ensuring structural strength, durability,
and fire resistance.
The portacabin includes two separate rooms, one bathroom, and a pantry area,
making it suitable for long-term and temporary use on site. All units are
factory-built under controlled conditions to ensure consistent quality and
fast deployment.
Typical applications include:
• Site offices
• Staff accommodation units
• Temporary project offices
• Industrial and utility buildings
Key Features:
• Fire rated prefab construction
• CFSF steel structure
• Factory assembled and ready to install
• Suitable for UAE climate and site conditions
• Custom layouts available upon request
Delivery, crane offloading, and foundation works can be arranged separately
based on project location and requirements.
|
TECHNICAL SPECIFICATIONS OF FIRE RATED PREFABRICATED BUILDINGS |
|||
|
1 |
BASE SKID |
1.1 |
Civil Works- Foundation 400x400x400mm (high) will be provided by the client as per the |
|
1.2 |
Base skid: The steel base skid shall be constructed |
||
|
1.3 |
Lifting eyes are provided at intermediate points along the perimeter beams |
||
|
1.4 |
Anti-corrosive: Perimeter |
||
|
2 |
FLOOR & FINISHES |
2,1 |
Floor Frame: C89x38x0.6mm LGS Joists fixed to the base skid as per design |
|
2.2 |
Floor Decking: One Layer of 18mm thick Cement |
||
|
2.3 |
Floor finish in Dry Area: |
||
|
50mm high PVC |
|||
|
Floor finish in Wet Area: 1.5mm thick PVC vinyl sheet |
|||
|
3 |
WALL FRAMING & FINISHES |
3.1 |
Wall Framing: Cold-formed steel Wall Insulation: 50mm thick Glass wool insulation with 12 Kg/m3 |
|
3.2 |
External |
||
|
3.3 |
Internal |
||
|
3.4 |
Internal |
||
|
4 |
ROOF |
4.1 |
Roof Roof overhangs/parapet/Gutter/fascia/Downpipes are not considered in our |
|
4.2 |
Trusses: Trusses are from cold-formed steel sections |
||
|
5 |
CEILING |
5.1 |
Ceiling: 12mm thick gypsum board, finished with Ceiling Joints shall be covered by 6mm thick CFB joint strips. Ceiling clear height shall be approx. 2.35m |
|
6 |
DOORS |
6.1 |
Entrance Door with Accessories: aluminum door frame with or without |
|
6.2 |
Internal Doors / Toilet Doors: Flat |
||
|
6.3 |
Internal Door Accessories: |
||
|
7 |
WINDOWS |
7.1 |
External |
|
7.2 |
Exhaust Window: Fixed window |
||
|
8 |
ELECTRICAL |
8.1 |
Electrical supply is single-phase 230V, 50Hz/60Hz as |
|
8.2 |
Electrical Final Distribution board (Consumer unit) |
||
|
8.3 |
Concealed PVC conduits shall be provided for |
||
|
8.4 |
PVC insulated Copper wires from NCI or |
||
|
8.5 |
Light Fixtures: |
||
|
8.6 |
Switch / |
||
|
8.7 |
Provision for water heater shall be provided only |
||
|
9 |
HVAC |
9.1 |
Split |
|
9.2 |
Exhaust fans are provided as shown in drawing. |
||
|
10 |
PLUMBING |
10.1 |
PPR pipes shall be used for the hot water and |
|
10.2 |
Sanitary wares: |
||
|
10.3 |
Sanitary fittings: Kitchen Sink: |
||
|
11 |
TELE / DATA CONTAINMENTS ONLY |
12.1 |
PVC conduits shall be provided for Tele/Data point Block wiring, Networking, sockets, junction boxes and system installation |
|
|
EXCLUSIONS: TO BE PROVIDED BY CLIENT: |
|||
|
1 |
Site Work: |
Foundation, |
||
|
2 |
Site entry: |
Entry permits (CICPA/CNIA – Security Permits) for our trailers, workers & Equipment’s and Site must be |
||
|
3 |
Lifting: |
Crane + lifting |
||
|
4 |
Furniture: |
Wardrobes, |
||
|
5 |
Accessories: |
Window blinds, |
||
|
6 |
Structural: |
Design |
||
|
7 |
Electrical: |
All external |
||
|
Generator, any |
||||
|
8 |
Plumbing: |
Embedded |
||
|
9 |
Mechanical: |
Fire Fighting |
||
|
Approvals: |
Civil defense, |
|||












