Description
🔥 Fire-Rated Prefab Ablution & Toilet Portacabin | ADCD Approved
This fire-rated prefab ablution toilet portacabin is designed to meet UAE site requirements and ADCD fire safety regulations. The unit is suitable for high-usage environments such as construction sites, labor camps, and industrial facilities.
The cabin is manufactured using insulated sandwich panels and installed on a heavy-duty steel base skid. The internal flooring is finished with GRP laminated flooring, ensuring hygiene, durability, and water resistance.
📦 Configuration Included
- 6 × WC (Water Closet)
- 2 × Wash Basins
- 2 X Urinals
- 1050 US Gallons -underneath GI tank
- Entrance MS Steps
🧱 Technical Specifications
- Fire-rated insulated sandwich panel walls & roof
- GRP Laminated Floor (Waterproof & Anti-Slip)
- Aluminum doors with locks
- Ventilation windows & exhaust fans
- Complete plumbing & drainage provisions
- Electrical lighting system
- Factory assembled and ready for installation
🏗 Applications
- Construction sites
- Labor accommodations
- Industrial facilities
- Temporary workforce housing
⚠️ Important Notes
- Foundation and crane scope by client unless agreed otherwise
- Layouts and quantities can be customized upon request
- Product images are for reference only
|
TECHNICAL SPECIFICATIONS OF FIRE RATED MODIFIED MARINE SHIPPING |
|||
|
1 |
FLOOR FINISH |
1.1 |
Floor finish |
|
2 |
WALL FRAMING & FINISHES |
2.1 |
External |
|
2.2 |
Internal |
||
|
3 |
CEILING |
3.1 |
Ceiling: GI sandwich type made from 0.4mm GI profile flat |
|
4 |
DOORS |
4.1 |
Entrance Door with Accessories: 120mints Fire rated steel door,SS handle, |
|
4.2 |
Internal Doors / Toilet Doors: Full |
||
|
5 |
WINDOWS |
5.1 |
External |
|
5.2 |
Exhaust Window: Fixed window |
||
|
6 |
ELECTRICAL |
6.1 |
Electrical supply is single-phase 230V, 50Hz/60Hz as |
|
6.2 |
Electrical Final Distribution board (Consumer unit) |
||
|
6.3 |
Concealed PVC conduits shall be provided for |
||
|
6.4 |
PVC insulated Copper wires from NCI or |
||
|
6.5 |
Light Fixtures: |
||
|
6.6 |
Switch / |
||
|
6.7 |
Provision for water heater shall be provided only |
||
|
7 |
HVAC |
7.1 |
Split |
|
7.2 |
Exhaust fans are provided as shown in drawing. |
||
|
8 |
PLUMBING |
8.1 |
PPR pipes shall be used for the hot water and |
|
8.2 |
Sanitary wares: |
||
|
8.3 |
Sanitary fittings: |
||
|
|
EXCLUSIONS: TO BE PROVIDED BY CLIENT: |
||||
|
1 |
Site Work: |
Foundation, |
|||
|
2 |
Site entry: |
Entry permits (CICPA/CNIA – Security Permits) for our trailers, workers & Equipment’s and Site must be |
|||
|
3 |
Lifting: |
Crane + lifting |
|||
|
4 |
Furniture: |
Wardrobes, |
|||
|
5 |
Accessories: |
Window blinds, |
|||
|
6 |
Structural: |
Design |
|||
|
7 |
Electrical: |
All external |
|||
|
Generator, any |
|||||
|
8 |
Plumbing: |
Embedded |
|||
|
9 |
Mechanical: |
Fire Fighting |
|||
|
Approvals: |
Civil defense, |
||||





